Arbutus Centre — Blocks C & D
Retaining walls, concrete bands and grade-controlled site work across multiple transitions.
Discuss a scope ↘

VANCOUVER & THE LOWER MAINLAND · BC
Built for field control, complex geometry and pre-pour readiness.
ERP Construction Ltd. is a concrete-forming subcontractor focused on difficult field conditions. Our team manages layout, elevations, form stability and sequencing through placement, controlled stripping and cleanup.
Layout, elevations, Top of Concrete and geometry checked before placement.
Dimensions, bracing, embeds, openings and cleanliness verified by field leadership.
A 10-person core team with one supervisor, two foremen, four carpenters and three helpers.
Browse ERP projects by concrete-forming type. Hover over a category to see each project, then select its name to go directly to the work.

03 — ARCHITECTURAL CONCRETE
Architectural concrete demands close control of curves, radii, offsets and changing elevations—from layout and forming through the finished surface.
ERP divided non-repetitive work into geometric zones and re-established field layout across five levels, coordinating complex architectural walls through pour readiness.
Formwork, layout and finished geometry.

Retaining walls, concrete bands and grade-controlled site work across multiple transitions.
04 — STRUCTURAL FORMWORK
Integrated footing, wall and high-form systems planned around structural continuity, stable bracing and controlled pour sequences.

Phased footing, exposed grade wall and pedestal system around an operating facility.
Forming, pedestals and exposed wall alignment.

Monolithic footing and wall system with long-run layout and constrained bracing.

High structural walls and an integrated stair and side-wall monopour.
05 — SPECIALTY FORMWORK
Repeatable control where every landing, rise and reference point must connect accurately across changing levels and field conditions.

Multi-level stair forming, reference control and parallel crew coordination.
06 — LET’S TALK
Share your drawings early so we can identify forming, access and sequencing concerns before the pour.